CALDER ROAD BEARING INSTALLATION & TEMPORARY WORKS, DEWSBURY

16E87D7D 5EA9 4618 A0BE 0835D5D2D5D8

As part of the Transpennine Route Upgrade, EKSPAN supported BAM TRU West with the installation of elastomeric and mechanical bearings at Calder Road. Discover how our expert-led engineering ensured a seamless beam landing and bearing transition under blockade conditions.

Tower Bridge – London

EKSPAN

EKSPAN were selected as Principal Contractor by The City of London Corporation to fabricate and install two new glass floors on Tower Bridge’s West and East Elevated
Walkways.

Hydro-Electric Power Station – Low Head High Pressure Pipeline – Pipe Section Replacement

EKSPAN

EKSPAN were instructed to remove and replace the damaged carbon wrap pipe with a new pipe section, including installation of an additional moving joint.
Pre-works operations involved establishment and setup of the site compound for delivery and positioning of site cabins, offloading of equipment and materials and preparation of plant and hydraulic equipment to enable jacking of the pipeline.

The Falkirk Wheel

EKSPAN

EKSPAN’s involvement in the Falkirk Wheel was the design, manufacture and installation of the aqueduct expansion joints.

Astana Stadium

EKSPAN

EKSPAN’s Solution
The roof construction of the stadium created a number of technical issues with respect to managing dynamic loads. Additional rotations and movements had to be considered at the main support positions to accommodate the nature of the mobile roof structure.