A38 Gloucester Road Flyover

EKSPAN designed, manufactured and installed 24 replacement bearings at Bristol’s A38 Gloucester Road Flyover, combining specialist temporary propping, hydraulic jacking and controlled load transfer.
Wichelstowe Swing Bridge

EKSPAN manufactured and installed Bushey Fox Bridge at Wichelstowe, bringing Sheffield workshop assembly, specialist bearing engineering and site installation together.
Three Arches Footbridge

EKSPAN successfully collaborated with Story Contracting to deliver a major milestone with the installation of a new 140 tonne asymmetrical steel arch bridge at Three Arches in rural Leicestershire, on behalf of Network Rail and alongside SPL Powerlines.
Old Tram Bridge

EKSPAN collaborated with Harrisons engineering, to successfully replace a 200-year-old Tram Bridge with a new £6.6m infrastructure across the River Ribble in Preston.
Westquay Shopping Centre

EKSPAN was appointed to deliver essential structural remediation and bearing works at Westquay Shopping Centre, one of Southampton’s most prominent retail destinations.
Clifton Bridge – Ongoing Program

EKSPAN partnered with SKANSKA to prepare essential bearing replacement works on Clifton Bridge, a vital structure located in Penrith.
A491 New Bishopmill Bridge

EKSPAN worked collaboratively with Pat Munro and MHB Consultants to deliver the bearing replacement works on Bishopmill Bridge in Elgin, a key structure with 39 years of service to the local community.
Newport Bridge Bearing Replacement – Stockton-on-Tees

As part of the multi-billion-pound TRU programme, EKSPAN worked alongside Skanska, Arup and the TRU Alliance to deliver complex structural support works on Span 1 in Huddersfield — completing a 12-day continuous operation with zero incidents, on time and with engineering precision to within 0.5 mm.
TRANSPENNINE ROUTE UPGRADE – SPAN 1, HUDDERSFIELD

As part of the multi-billion-pound TRU programme, EKSPAN worked alongside Skanska, Arup and the TRU Alliance to deliver complex structural support works on Span 1 in Huddersfield — completing a 12-day continuous operation with zero incidents, on time and with engineering precision to within 0.5 mm.
GOVAN-PARTICK BRIDGE, GLASGOW BRIDGE BEARING REPLACEMENT

EKSPAN designed and installed permanent and temporary bearing solutions for Glasgow’s Govan Partick Bridge, ensuring safe construction and long-term performance of one of Europe’s longest opening pedestrian and cycle crossings.