ALONGSIDE OUR CLIENTS AT FARRANS CONSTRUCTION, EKSPAN PROVIDED THE £29.5 MILLION CIVIL ENGINEERING PROJECT WITH BEARING AND TEMPORARY WORKS SOLUTIONS.
The team provided design, manufacture and installation services for the steel cable, stayed opening swing bridge.
EKSPAN SUPPORT
The EKSPAN team gave the Farrans team end-to-end support with the required temporary works and bearings. We designed and manufactured the temporary works and bridge bearings solutions required for this challenging project.
In addition to design and manufacturing, our experts installed the jacking arrangements and temporary restraints needed for the team to safely complete the project. The team created and installed 2 stainless steel link bearings and 2 uplift pot bearings, designed and manufactured to suit the specific needs of the project. We also assisted our clients with the landing of the structure. By applying our knowledge and experience of bridge projects we confidently supported this critical stage in the construction process.


HOW EKSPAN CAN SUPPORT YOUR PROJECT
EKSPAN’s commitment to British manufacturing standards meant the client was satisfied the Govan-Partick bridge would be designed to support and made to last. Every solution was created from our facility in the UK.
To learn more about our temporary works services, see here.
Check out our product pages to see more about our link bearings and pot bearings.
Use the contact form below to speak to our experts on we can assist in your civil, mechanical or structural engineering project today. We can create the bespoke solution you need that is designed to support and made to last.
CONTACT US
Have a question or need assistance? The EKSPAN team is here to help!