Three Arches Footbridge

EKSPAN successfully collaborated with Story Contracting to deliver a major milestone with the installation of a new 140 tonne asymmetrical steel arch bridge at Three Arches in rural Leicestershire, on behalf of Network Rail and alongside SPL Powerlines.
Old Tram Bridge

EKSPAN collaborated with Harrisons engineering, to successfully replace a 200-year-old Tram Bridge with a new £6.6m infrastructure across the River Ribble in Preston.
Westquay Shopping Centre

EKSPAN was appointed to deliver essential structural remediation and bearing works at Westquay Shopping Centre, one of Southampton’s most prominent retail destinations.
Clifton Bridge – Ongoing Program

EKSPAN partnered with SKANSKA to prepare essential bearing replacement works on Clifton Bridge, a vital structure located in Penrith.
A491 New Bishopmill Bridge

EKSPAN worked collaboratively with Pat Munro and MHB Consultants to deliver the bearing replacement works on Bishopmill Bridge in Elgin, a key structure with 39 years of service to the local community.
Tower Bridge – London

EKSPAN were selected as Principal Contractor by The City of London Corporation to fabricate and install two new glass floors on Tower Bridge’s West and East Elevated
Walkways.
Tower Bridge – London – High Level Glass Walkway Installation

EKSPAN were selected as Principal Contractor by The City of London Corporation to fabricate and install two new glass floors on Tower Bridge’s West and East Elevated
Walkways.
Northern Hub – Structure Dse146 Span 19 T-Mat 80 Joint & Bearing Installation

EKSPAN was contracted by Skanska BAM Nuttall JV to install 2 no. T-Mat 80 expansion joints with concurrent installation of mechanical and elastomeric bearings on the DSE146 Span 19 structure.