M27 River Hamble Bridge – Strengthening & Bridge Upgrading 2008

EKSPAN were successful in securing the design and manufacture of 60 new stainless steel mechanical bearings. EKSPAN were also responsible for the temporary works design and bridge jacking. The works was successfully completed in September 2008.
The Falkirk Wheel

EKSPAN’s involvement in the Falkirk Wheel was the design, manufacture and installation of the aqueduct expansion joints.
A40 Westway – London : Finger Joint Manufacture and Installation

EKSPAN manufactured 208 no finger joints, which replicated the existing finger joints, on a like for like basis to suit interchangeability during installation. Badly eroded joints requiring immediate attention were temporarily repaired using welding plates.
M1 Tinsley Viaduct Strengthening & Upgrading

EKSPAN were instructed by Eversendai Engineering to design, manufacture and supply 522 no mechanical and elastomeric bearings for installation on 58 bridges, on two levels.