PROJECTS & SECTORS / WICHELSTOWE
SPECIALIST ENGINEERING. PRACTICAL DELIVERY.
Made in Sheffield.
Set in motion at Wichelstowe.
LOCATION
Wichelstowe, Swindon
WORKING WITH
Fox (Owmby) Limited
BRIDGE DESIGN
Mason Clark Associates
EKSPAN’S ROLE
Manufacture & installation
A CROSSING WITH A MOVING PURPOSE
A manually operated swing bridge, bringing a new connection to Wichelstowe’s waterway.
Bushey Fox Bridge serves walkers, wheelchair users and cyclists. When boats need to pass, the bridge rotates on its pivot bearing into a purpose-built recess in the canal bank.
EKSPAN brought manufacture, specialist bearing installation and site delivery together, taking the bridge from its Sheffield workshop to the crossing at Wichelstowe.
Explore our manufacturingFROM WORKSHOP TO WATERWAY
Manufacture. Trial assembly. Installation.
The people and detail behind the crossing.
01
The complete bridge was manufactured and assembled at EKSPAN’s facility, bringing structural fabrication and mechanical components together.
02
Trial fitting took place before delivery. Working for Fox (Owmby) Limited, EKSPAN then installed the bridge at its canal crossing.
SMALL DETAILS. ESSENTIAL MOVEMENT.
The pivot bearing is the point around which the bridge turns. EKSPAN’s scope included installing and grouting the bearing, with temporary supports and jacking used to set the bridge at the required level.
01
Positioning and grouting the pivot bearing.
02
Supporting the structure during level setting.
03
Connecting the fabricated bridge with its bearing support.
ENGINEERING KNOWLEDGE. PRACTICAL DELIVERY.
Workshop capability and specialist site teams,
connected around one project.
MORE ENGINEERING IN PRACTICE
LET’S START WITH YOUR PROJECT
Bridge manufacture, bearing requirements or specialist site works.
Talk it through with the EKSPAN team.