As part of the wider Leeds Station Sustainable Travel Gateway scheme – a £46.1M project to improve access and pedestrian infrastructure around the station – EKSPAN were engaged to assist Balfour Beatty with the installation of critical structural bearings across the Mill Goit. With a heritage-sensitive location and tight spatial constraints, the project demanded exceptional planning, on-site precision, and safe sequencing to support phased beam installation and structural load transfer.
Our scope of works included the following key services:
Given the presence of adjacent Grade-II listed structures, a careful and collaborative approach was vital. EKSPAN’s expertise in structural movement and support systems ensured a smooth transition from temporary packers to permanent supports – while avoiding any disruption to live station
EKSPAN are trusted partners for complex, time-sensitive infrastructure projects across the UK. Our in-house team delivers full engineering design, bearing manufacture and site installation – all to exacting national standards. Whether supporting new builds or upgrades on heritage assets, we bring unmatched precision to every project.
For more information about our full range of structural bearings and structural engineering solutions, visit our Structural Bearings page or Contact Us to speak to a specialist.
Have a question or need assistance? The EKSPAN team is here to help!