BRIDGE OF AVON EXPANSION JOINT REPLACEMENT, SCOTLAND

BRIDGE OF AVON EXPANSION JOINT REPLACEMENT, SCOTLAND

EKSPAN are delivering phased expansion joint replacement works on Bridge of Avon – supplying and installing our T-Mat bridge deck joint systems to improve ride quality, reduce long-term maintenance demands, and enhance the bridge’s structural performance.

EKSPAN SUPPORT

  • Breakout of existing concrete nosings and removal of debris
  • Installation of sub plates, tied into existing bridge deck reinforcement
  • Pouring and curing of a new concrete substrate
  • Installation of both T-Mat 30 and T-Mat 80 joints, depending on specific span requirements manufactured by EKSPAN
  • Application of nosing mortars and anti-skid surfacing
  • Placement of verge cover plates for system closure

Following completion of the first carriageway, EKSPAN have now progressed to the second – using the same tightly coordinated process and methodology.

WHY T-MAT?

The T-Mat system is engineered for continuous fitment – offering smoother transitions for vehicles, improved durability, and effective movement absorption. It reduces water ingress risk and the likelihood of joint failure over time, making it ideal for structures like Bridge of Avon.

RESULTS TO DATE

SUPPORTING UK INFRASTRUCTURE

From standard joint replacement to complex bearing installations, EKSPAN support the UK’s leading contractors across highways, rail, and civils sectors. All our solutions are designed, manufactured, and installed by our in-house teams – ensuring full accountability from start to finish.

Download the case study

CONTACT US

Have a question or need assistance? The EKSPAN team is here to help!

 

Contact Us